TROST: Open-System Trustworthiness

Project P050409 TROST Pilot
Consolidate Design

TROSTing>projects>
pilot>design>

P050409>
0.10 2005-05-19 -13:27 -0700


Type: Project Development Project ID: P050409
Style: Abbreviated Status: Initiation
Objective: 
Integration of the Design into a single Design Management document.
1. Deliver document for management review and acceptance.
2. Transfer any released critical path to the ODMref 1.0 Base development and Template Documentation tasks for use as buffer there.
Related Information/Projects:
P050403: TROST Pilot Design
P050406: Design I - Life-Cycle Framework
P050407: Design II - Application Assurance
  
Conditions of Satisfaction:
see P050403: TROST Pilot Design
 
 
 
Inputs:
Guidelines for Final Project and Dissertation Module, version 7.53 (2005-03-12)
TROST Project Specification (2005-03-20)
TROST Exception Review Report
Dissertation Project Plan 6.x
TROST-Design I: LifeCycle Framework
TROST-Design II: Application Assurance
TROST Design III: Software Development
Outputs:
P050409b: TROST Pilot Design Report
 
Assigned To: Dennis E. Hamilton Defined By: Dennis Hamilton (2005-04-20)
Date Initiated: 2005-05-05 Date Completed: tbd
 

1. Approach (2005-05-12)

2. Activities (2005-05-13)

 


0.10 2005-05-13-13:40 Prime the pump with basic structure and bootstrapping for content
The task is set to go forward as described, with materials organized for creating the report
0.00 2005-04-20-22:57 create  placeholder to morph into the necessary material
Incorporate job jar and use it to drive the gathering of materials from this already-completed task.

Construction Zone (Hard Hat Area)

Creative Commons License You are navigating TROSTing.org.
This work is licensed under a
Creative Commons License.

created 2005-04-20-22:57 -0700 (pdt) by orcmid
$$Author: Orcmid $
$$Date: 05-07-21 13:36 $
$$Revision: 25 $

Home