Project
P050407
TROST Pilot |
Type: Project Development | Project ID: P050407 |
Style: Abbreviated | Status: In Progress |
|
|
|
|
Assigned To: Dennis E. Hamilton | Defined By: Dennis Hamilton (2005-04-20) |
Date Initiated: tbd | Date Completed: tbd |
[Fill in when the task is initiated.]
Progression levels [spec: 3.1]:
- Software Delivery, Deployment, Operation and Support (from the problem-space situation)
- Software Application (from the problem-space viewpoint, but as an instrument with intermediate-architecture layer)
The supplier perspective versus the receiver perspective needs to be made clear between here and Design I.
- Initiate Design II. Conduct a mini-rolling wave and setup on this task when initiation time arrives.
created 2005-04-20-19:17 -0700 (pdt) by
orcmid |