c080201
nfoCentrale Construction Note |
nfoCentrale>construction> |
- Latest version: The latest status of the nfoCentrale Repaving Project can be found via nfoCentrale construction/2010/05/c100501b.htm.
Work Area Notice: The Included Content Page notice that repaving customizations are required is at construction/2010/05/c100501b1.htm.
- This version: 2010-05-12 Announcement 0.00 construction/2010/05/c100501c.htm. Provides the document engineering and related information for the repaving activity.
- Include Pages:
- The Included Content Page Repaving Notice:
construction/2010/05/c100501c1.htm- Construction Structure Completion Include Page: When a Construction Structure has been fully customized, this inclusion is used in place of the announcement to indicate that the Construction Structure is in complete conformance for that level and all construction structure below it. The Web Component for inclusion is at construction/2010/05/c100501c2.htm>
- Content Material Completion Include Page: When the content material of a folio, immediate content, or an entire construction zone is repaved, this Web Page Component is included: construction/2010/05/c100501c3.htm
- Content Conforms Include Page: When new material is created and we want to provide an explicit account of the site-structure rules that material was created in conformance with: construction/2010/05/c100501c4.htm
|
The basic notice is used for notification in all locations where customization of material is needed before the repaving is complete. This notice applies to the level at which it appears and all levels deeper than that. It cannot be removed until the current level and all lower levels are complete. If there is content as well as construction structure at or below a given level, this notice is not removed until the bootstraps of both are complete and so indicated.
|
This insertion amends/replaces the announcement insertion when the construction structure at the point of insertion and for all deeper levels have been repaved.
The Content Material here was successfully customized as part of the 2010-05-12 stage of Site Repaving. Check those pages for additional details of the approach to customization. Contact the nfoCentrale technical coordinator with questions and to report any defects that you notice.This insertion amends/replaces the announcement insertion when the content material governed by a job jar, a Construction Structure page, or a Construction Zone has been repaved.
This material conforms to the 2010-05-12 styles for Site Repaving. Check those pages for additional details of the approach and the styles. Contact the nfoCentrale technical coordinator with questions and to report any defects that you notice.This insertion is used with new material that is created directly on the site with no repaving beyond customization of any boilerplate used.
The first priority is to have the construction structure of the site be current and properly connected.
This is accomplished by performing a review starting with the "front porch:" the root materials of nfoCentrale. Work items and their completion will be reported as part of the front-porch Construction Zone.
After the front porch is adjusted, the construction structure of each subfolder is reviewed, extending recursively through all of the construction-structure elements only. Additional items that happen to be noticed will be added to the work items of the applicable construction zone.
The construction structure and the related construction zones can be located by navigating the construction structure provided at the front porch.
When the construction structure is reviewed and adjusted as necessary, a completion message will be inserted to avoid wondering which structures have and have not been reviewed.
The second priority is to have enough Construction Material be consistent, reachable, and providing the proper templates.
It is not necessary to rush customization of material that is used only by the web master, so long as the material that visitors see on main content pages is correct.
Template materials will be correct, but the descriptive material for their use might not be updated until more-urgent content is provided.
The third priority is to have a Completed History Description and Construction Materials Available for Use. Additional material that has been held for incorporation on this site is introduced.
Any additional sections will be "born" in the correct style and format for the site. There will be no need to manage repaving for such materials.
You are navigating Construction Material |
created 2010-05-06-19:30 -0700 (pdt) by
orcmid
|